We launched our data centre at Sputnik Mall in Almaty and installed client equipment on site. We will discuss your workload, connectivity and support requirements and prepare a hosting option and quotation for your project.
Equipment on site
Mercury Consulting Service server infrastructure at Sputnik Mall.
Power and cooling redundancy
The engineering infrastructure description was updated on 2026-10-04. The data centre uses 2N and N+1 redundancy configurations. Power and cooling are supported by paired equipment, with capacity headroom at every stage. The building has 2 electrical feeds. Automatic transfer switching and 2 UPS units are provided. These elements form part of the data centre’s power redundancy system. The server infrastructure is cooled by 2 climate control units. Redundancy and capacity headroom are provided for the equipment’s thermal load. Backup power is provided by 2 generators. Capacity headroom is also incorporated at this stage.
Two options for your IT infrastructure
For companies using their own servers who want to host them in a data centre. We agree on equipment, connections and the scope of technical support. For a quotation, specify server quantities and dimensions, power consumption, network requirements and your preferred hosting date. For companies needing computing resources without purchasing servers. We select a configuration for your systems; resource availability and the delivery model are agreed in the quotation. Specify CPU, RAM, storage capacity and type, operating system, network requirements and required support.
Discuss placement
Available resources, connection parameters, access procedures, support hours and SLA are specified for your project in the quotation and contract. Send your hosting or resource rental requirements. We will discuss technical parameters and prepare a quotation. Specify equipment hosting or resource rental; server quantities / CPU, RAM and storage; power, connectivity, support and timing.

